Skip to Content
author's profile photo Former Member
Former Member

Item proposal issue

Hi

experts,

As i have been asked to work on item proposal, could you plesese any one of you explain the process with configuation.

thanks

Ahmed

Edited by: Ahmed quadry on Aug 11, 2009 9:18 AM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Aug 11, 2009 at 07:33 AM

    Product Proposal is a sales order type which is MS or PV order type in STD SAP inVOV8

    This will have sales doc category D

    No ranges assigned to it

    Propability will be 100%

    Screen seq group NA

    Doc pricing procedure c

    No del type

    No billiing type

    Pls assign this doc first in the sales areas in which you want to use in t code OVAZ

    Then create a product proposl in which you want the materials to be added with quantities in VA51 with this order type MS pr PV

    This will generate a doc no

    This doc no you assign in your customer master records in sales area data sales tab in item proposal field

    Now when you create sales order for this customer in VA01 after inputting SP before entering materials

    Go to EDIT in menu bar ADDITIONAL FUNCTIONS ---PROPOSE ITEMS or crtl+F11

    Then this dialogue box with this proposal no will appear

    Copy then it will copy all the items that you have listed in the proposal or you have the option of selecting a few items in that proposal for a particular order

    Configuration Reqd is Sales order type MS or PV should be applicable in your sales area That is OVAZ assignment (only config)

    Proposal to be created in VA51 and that doc number should be assigned in CMR in the sales area data sales tab ( this uis also transaction only)

    Regards

    Raja

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi

      I havent come across the error which you are telling

      This means there is some configuration is wrong or missing in VOV8 for your Item proposal order type either MS or PV

      Make sure in the transaction flow tab of Item proposal order type either MS or PV these settings

      Screen sequence group MA

      Incomp procedure 16

      Transaction group 5

      DPP C ( these are standard default settings)

      There is no need for maintaining copycontrol in VTAA

      Some customization wrong somewhere if you correct it your issue will be resolved

      Regards

      Raja

      Note Please dont mark thread as answered if the entire issue is not closed

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.