PP/QM Integration

Former Member
0 Kudos

Dear all

My scenario asks for ROH material quantities planning ( Simulative ) based on MIC values for existing batches.In other words based on the available materials and the MIC values i will have to decide on the quantities for FERT material.It will be required to continuously change the quantities of ROH i.e BOM quantities till i acheive the required MIC values for the FERT material.Can I integrate MIC values to do my Planning.

S Anil

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

You can create a class with those special characteristic values and assign the values to the batch for the materials.And use quantity calculation procedure to calculate the quantity of input materials at the time of confirmation.

Use the below link,

http://help.sap.com/saphelp_erp60_sp/helpdata/en/05/603bc6462311d182b50000e829fbfe/frameset.htm

Please go through the details of the process for quantity calculation procedure for the materials and than try linking the same for your case.

Hope this will help.

regards,

kaushik

Former Member
0 Kudos

Hello,

I am too in a similar situation. Can somebody plzz help us with this matter.

Best regards,

Hanish