Hi,
Where PM equippment is assigned to PP workcenter ?
can we do it through CR01/CR02 in PP or we have to go to equippment and there only to do ?
if i go to IE02 there in the location tab two fields are there
Work center
Main work center
where we have to assign PP work center ? next once i assign which tables and fields i have to use to fetch data from SAP tables that this equiipment is assigned with this workcenter ?
what are all the benefits if i assign equippment to workcenter ?
regards
madhu kiran.