on 08-06-2009 9:20 AM
Hi all,
I am running actual overhead calculation with KGI2.
But the overheads are not getting updated in the order.
Order contains relevant overhead key also.
What could be the possible causes?
SmanS
Hi,
there are several possibilities.
1: KGI2: "test run" is flagged.
2: KGI2 / extras / settings:see the baseline definition in the costing sheet and check if there are values given for your particular overhead calculation.
3: same place: chek if the overhead rate (i asume its percentage overhead) is maintained for the period you are running overhead calculation
Try this and give some feedback.
Best regards, Christian
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Christian,
Sorry for replying so late.
I am facing a lot of problem while calculating the overhead cost as I am evaluating this for the first time.
Mean while I had maintained the required values in costing sheet in KZS2.
Maintained the % against material overhead rate as well as manufacturing overhead rate.
Maintained the credit values for the overhead rate.
Maintained the calculation base values also.
Now while overhead calculation with KGI2, I am getting two errors as follows,
1. S:K5:162 E02 20090831
2. Error CREDIT_SEGMENTS_ADD COIOB NOT FOUND for object
I can not figure out the reson.
Help me to tackle the same.
SmanS
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.