Expiration Date and Production Date.

Hi everybocy, I noticed when I perform a GR by PO using MIGO, that some materials require the Production Date to post the GR, and the Expiration Date is calculated using it. And others materials require only the Expiration Date to post the GR. And others materials dont need these dates. I am developing a program, where I need to identify these types of materials. How can I identify every kind of materials described above?

Regards.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Aug 04, 2009 at 02:19 PM

    Hi,

    System will promt you to enter these fields based on material master settings for that particular plant.

    Please check with your functional team on how to identify different type of material (by Material type/group etc..)

    Hope this helps.

    -Ramesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 14, 2009 at 06:25 PM

    .

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.