Skip to Content
0
Former Member
Aug 04, 2009 at 09:51 AM

WRONG PLANT GENERATED WITH MATERIAL DOCUMENT IN HU02

41 Views

Hi All,

I am packing Handling unit with HU02 with following options.

Supplying plant 4140

Storage loc 2000(FG) to 2100(HU) with Batch number 11.

After Saving this HU, when i check Material Document in Migo generated for

above Handling unit, it shows Material From 4340 plant & Sto loc. 2000 to 2100. I had never entered 4340 plant.

How this is updating?Any setting is missing? Material is Batch Activated.

Kindly guide

Reg

Jay