Subcontract stock in MRP calculation

JavedA
Explorer
0 Kudos

We have S/4 HANA 1610 but we are not using live MRP. We have scheduled background job to execute ABAP program RMMRP000 to run the MRP every night.

Our Scenario:

Total unrestricted stock for X material at Plant level= 13

MRP Type = PD (System is Creating Purchase Requisition if total available stock is less than Safety Stock, in our case it is 15)

Stock provided to Subcontractor (Vendor) = 11

In MD04 it is showing Total plant stock =24 (13+11=24)

When MRP is executing it is not considering this material and not creating Purchase Requisition, because system is considering Total available stock as 24 which is not less than Safety Stock, therefore system is not creating Purchase Requisition.

Expectation: We do not want the system to include Subcontract stock as available stock. We are expecting that MRP should consider this material and create purchase Requisition since available stock is 13 and which is less than safety stock qty 15.

Accepted Solutions (1)

Accepted Solutions (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

In SAP S/4HANA the subcontracting scenario was simplified. Check out my article in SAP Insider, which explains how to implement this scenario in S/4HANA using Subcontracting MRP areas:

https://sapinsider.wispubs.com/Assets/Articles/2018/March/SCM-Expert-Implementing-the-Simplified-Sub...

Regards,

Caetano

Answers (5)

Answers (5)

JavedA
Explorer
0 Kudos

Thanks, I want to close this thread.

Regards

Javed Akhtar

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

You already accepted the correct answer, so you can consider it closed.

JavedA
Explorer
0 Kudos

Yes, I implemented Subcontractor MRP Area and fixed the issue.

Regards

Javed Akhtar

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Javed

Can you please close this thread accepting the correct answer?

Regards,
Caetano

Mahendran8888
Contributor
0 Kudos

Usage of lot size will resolve this issue

Caetano
Product and Topic Expert
Product and Topic Expert

Hello Mahendran

I don't think this is a lot sizing or safety stock issue at all!

This is related to the simplifications introduced in S/4HANA for the subcontracting process, where there is no separated stock segment for the subcontractor without MRP Areas.

Regards,
Caetano

Mahendran8888
Contributor
0 Kudos

Could you please share your screenshot?

Mahendran8888
Contributor
0 Kudos

This is the effect of Safety Stock. if you want to maintain the stock level yo can use ROP function