on 09-13-2018 8:39 PM
We have S/4 HANA 1610 but we are not using live MRP. We have scheduled background job to execute ABAP program RMMRP000 to run the MRP every night.
Our Scenario:
Total unrestricted stock for X material at Plant level= 13
MRP Type = PD (System is Creating Purchase Requisition if total available stock is less than Safety Stock, in our case it is 15)
Stock provided to Subcontractor (Vendor) = 11
In MD04 it is showing Total plant stock =24 (13+11=24)
When MRP is executing it is not considering this material and not creating Purchase Requisition, because system is considering Total available stock as 24 which is not less than Safety Stock, therefore system is not creating Purchase Requisition.
Expectation: We do not want the system to include Subcontract stock as available stock. We are expecting that MRP should consider this material and create purchase Requisition since available stock is 13 and which is less than safety stock qty 15.
Hello
In SAP S/4HANA the subcontracting scenario was simplified. Check out my article in SAP Insider, which explains how to implement this scenario in S/4HANA using Subcontracting MRP areas:
Regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks, I want to close this thread.
Regards
Javed Akhtar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes, I implemented Subcontractor MRP Area and fixed the issue.
Regards
Javed Akhtar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Usage of lot size will resolve this issue
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Mahendran
I don't think this is a lot sizing or safety stock issue at all!
This is related to the simplifications introduced in S/4HANA for the subcontracting process, where there is no separated stock segment for the subcontractor without MRP Areas.
Regards,
Caetano
Could you please share your screenshot?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This is the effect of Safety Stock. if you want to maintain the stock level yo can use ROP function
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.