Item 001 Order 99999999 budget exceeded SRM 5.0 Classic Extended

13 Views

There are two issue that seem to be going on with budget being exceeded.

One is that when looking at the Budget Overview the Credit Limit Used seem to be twice that of what is noted in our backend system.

The second one is the Assigned value is not the same as that in the backend system.

In both cases the sysem of record ECC is correct. Is there a way to refresh the information from the ECC side or how do I find out why the Credit Limit Used is way over the assigned limit.

The ECC (backeend) allows a 10% overage to occur. How do I get SRM to allow for the 10% over so that we do not exceed the limits and cause an error.