cost estimate (CK11N)is not picking the overhead cost for some of the mat

290 Views

Hi all,

we are facing a problem. The overhead key is defined. the calculation base is defined in the cost sheet. But the overhead cost is not picking for some of the materials

Bad Material 5019-0581 via CK11n.

As you can see in the itemization, only the material and the routing are listed. No amounts from the OH of ZPTA ( .10). It should show a line #5 with an amount of (28 quantity x .10) = $2.80 added to the Total value.

first three line items it is picked from material and fourth line item from the internal activity.

the fifth item from G overhead is not picked.