Jul 31, 2009 at 07:44 AM

Sub contracting

24 Views

Hi All,

I have scenerio in subcontracting..

I have a finished material A and its having two boms (Bom 1 = Material C ) and (Bom 2 = Material D). Material C and D are with same specification but from different quality or different brand.

I am ordering the finished material A to a vendor with bom 1.

Now I want the system to check the availability of the bom 1 for material C and if there is no stock, system should suggest bom 2.

Is it possible in SAP?

Regards

Senthil