on 07-30-2009 3:27 AM
Hi:
I am using WebI XI 3.0
I have a report with 2 blocks
Block 1 - graph with
Block 2 - table
requirement is if we drill down on the graph the same drill should be applied to the table
is there a way this can be achieved ?
Thanks
Its Quite easy..........
Just go to the preferences window (left side button of "logout button")
go to the "Web Intelligence Document " tab and then
in "general drill option panel", there just check "Synchronize drill on report blocks"
check box..
Thats it...........
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Perfect - Thank you !
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.