cancel
Showing results for 
Search instead for 
Did you mean: 

Material and Equipment master assignment

former_member292201
Participant
0 Kudos
capture.jpg

Hi,

I want to know the configuration, how a single material is assign to a specific Equipment master.

In my case, multiple equipment master has been generated against the single material code.

Here multiple equipment is assigned to a single material.

My question is How a specific equipment will be assigned to single material.

Thanks & regards,

Koushik

Accepted Solutions (0)

Answers (0)