Hi,

The R/3 system in our project was upgraded from 4.6 c to ECC 6. After the upgrade we are facing issues with the lmapping look -up.

We have used RFC channel to do look up and and java codes which calls the RFC and dose parsing.

Right now after upgrade , there is no error in the channel ...but the XI is not able to do retrive value from the new system.

for the values it says , it does not exsist in the look-up table, although that is not true, the values are there in the system.

can you advice what went wrong and what steps should i take .

Thanks.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Jul 28, 2009 at 12:14 PM

    Does the Function Module run in the ECC system(with correct results) as a standalone with the same input parameters as it goes from XI ?

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 28, 2009 at 12:15 PM

    Did you checked that RFC is working fine in R/3 itself and try to post the same request and check

    other options can be debugging by setting external break point

    If above wont works check the roles if any required for executing RFC remotely

    Rajesh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 28, 2009 at 03:58 PM

    Pooja,

    It seems that something changed in your rfc after your upgradation. Try to import the rfc once again and give a try.

    Regards,

    ---Satish