Preventive Plan pattern or Model

former_member220454
Participant
0 Kudos

Hi,

I need advices about a solution. I need to put preventive plan model/pattern. Business requirement. The model key is a simple example, a cycle 3 month, for all the FL with the same object type, scheduling period 3 Y.

For that i created a Z table with this caracteristics. And when the user choose a pattern the program create the preventive plan on his plant.

Have you a better standard solution than this Z table to have this pattern/ Model ?

Thanks

Serge

Accepted Solutions (0)

Answers (1)

Answers (1)

MTerence
Active Contributor
0 Kudos

Hi Serge,

Do you want to create separate order for each FL or only one order ?

  • If you want separate order for each FL, you can create a single plan / single item or single plan / multiple items assign the FL as maintenance items (max. 99)
  • If you can manage with one order, then add the FL in the object list of the maintenance item. Here it will be Single Plan / Single Item but Multiple object list.
  • You can use Sort Field in the maintenance plan to group the FL based on Object type.
  • Maintenance plan creation is one time activity and you can schedule a batch job to make sure it generates the order automatically.

Regards

Terence