Production order scheduling - Time specific

24 Views

Hi all,

I have one scenario

Maintenance order created for particular workcenter with system condition '0' not in operation . time for operation 2 hours.

capacity requirement created (2 hours) in cm50 with order number creation.

the question is

If i create production order(that same worcenter assigned for first operation), system not considering that 2 hours. (plant time 9.00 to 18.00) system plans and scheduled start time as 9..00.

but it has to schedule as schedule start time as 11.00 right..

why the system not considering time specific scheduling

what i need to do configuration settings???

Looking for answers

thanks in advance