on 07-22-2009 9:11 AM
hi everyone,
can anyone plz tell me the answer for following
. In which areas of the system can you specify whether and how MRP is to be carried out at a plant?
A. Material Master.
B. In the customizing IMG activity for Material Requirements Planning
C. In the customizing IMG activity to activate MRP and setting up the planning file.
D. MRP1 view of the Material Master.
E. Only a) and b) above.
thanks in advance
shreek
Dear Shreek,
For running MRP,
1.You need a proper material master and proper BOM and rtouting for the procurment type E materials.
2.Proper MRP type and MRP datas in MRP1,2,3,4 views along with the settings in OPPQ - carryout overall parameters for MRP at
plant level,activating MRP for plant and planning File Entries.
3.Without any planning file entry you cannot run MRP.
4.MRP steps includes
1. Checking Planning File entries
2. Net Requirement Calculation
3. Calculating Procurement Quantity
4. Scheduling
5. Determining the Procurement proposals
6. BOM explosion & determining Depenedent Requirements
7. Creation of Exception Messages
Also check this link to explore more on MRP,
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shreek,
100% am confident the option is E
Cheers,
Kumar.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The option is 'E'
Regards,
Andra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Below are the prrequisites to run the MRP for the particular plant form MM perspective.
1) Plant must be activated for MRP in customizing under MM>CBP>Planning>Activate
2) Plant parameters must be maintained in Customizing under MM>CBP>Plant parameters
3) Material master have to maintained for atleast MRP1 & 2 views
4) MRP type ND-Noplanning must not be used in the material master MRP view
Hope you can decide the answer now.
Thanks / Karthik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The MRP type in MRP1 view of the Material Master is play vital role for Material Requirements Planning .
But the settings are made in each material master in the MRP 1,2,3,4, views which decide MRP.
For example:
MRP Type defines how a material is planned
MRP Types are defined at Plant level
Minimum stock levels can be managed using Safety Stock
Template recommends limiting MRP Types to PD, V1/VB and ND.However PD is highly recommended on the principle that planning is based on actual requirements and not just a fixed reorder point.
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The option is E.
Thanks
Shashi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Its E
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
The factors which influence the MRP is
1) In Material master u need to maintain the MRP views and there in MRP1 view.MRPtype,and Lot Size need to bemaintained
MRP2 view:Procurement type,Scedule margin keyinhouseprod time,gr Processsing time,Planned delivery,
MRP3 View:Strategy gtoup,Availabilty check...
2)in OPPQ for u r plant MRP settings are to be done
3)activate the palnning file entry
Hope this helps u
Regrds
Sravanthi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.