Skip to Content
0
Former Member
Jul 22, 2009 at 07:37 AM

Inspection Point at Operation Level

238 Views

In inspection plan of a material there are 2 operations.Out of these 2 operations, i want to assign inspection point only for 1 operation.and for 2nd operation i dont want inspection point.but as it is a header level data,i am not able to do it.so how can i do this?