Skip to Content
0
Former Member
Jul 21, 2009 at 04:32 PM

Preliminary costing of product cost coll. XXXX terminated

179 Views

I got this error during creation of PCC through KKF6N.

System suggesting below things,

Enter the routing in detailed planning or rate-based planning, or enter at least one reporting point in the affected routing, or change the header unit of measure in the routing in question back to what it was originally. Then start the transaction again.

As per me, all settings are correct.

Can anybody please suggest, what is the problem or what i missed?

Edited by: Deven on Jul 21, 2009 10:03 PM