cancel
Showing results for 
Search instead for 
Did you mean: 

mvt type 311

Former Member
0 Kudos

Dear All,

I have transfer material sloc to sloc using mvt type 311, our requirement is to control the mvt type.

can i assign release strategy to this time.

Thanks

Shital

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

There is no provision to assign Release Strategy to material Doc. However this can be restricted at Authorisation level for T code MB1B / MIGO_TR.

Regards

Bhavesh Mistry

Answers (1)

Answers (1)

Former Member
0 Kudos

Find user exit and take help of ABAPER for controlling the Mvt 311