Skip to Content
author's profile photo Former Member
Former Member

Master Template

Hi Friends

Can any one please guide me Calibration Master Template with QM flow because here PM module is not implemented.

Thanks & Regards

Gajendranath

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 19, 2009 at 06:39 AM

    hi

    Gajendra

    I will tell you in brief about how QM calibration is related to PM.

    we have 14 inspection type which is used for calibration purpose.

    A equipment is created as Equipment master IE01.

    Scheduling is done through IP01 for which you have to create a task list in IA01 or IA05.

    on QM you have to use sampling procedure with plant maintenance with inspection points for plant maintenance in task list(IA01 or IA05)

    A Maintenance order in IW31 gets create which in turns create inspection lot 14 type in background.

    Refer following link

    qm-test-equipment-management--calibration

    Regards

    Sujit

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.