Hi expert,

For the leave request workflow, I do all the necessary configuration (in spro) and the workflow is triggered correctly . I

have 2 approvals step in my workflow and forthe cancellation i have a problem.

1.In fact for the cancellation scneario, how is working in the standard leave request ?

2.In fact i have to do that ==> in case of one approval ==> send mail to the first approval

in case of total approval ==> we have to delete the absence in the background and send mails to both ?

How can do that please ?

I think creating a table which will contains the Request id , version no and the status (complete approved, partially approved) but when we launch a cancellation scenarios, the req id and version no of the new document is differnet ==> so we can't check the status of the document (completly approved or partially appoved or not yet approved at all) ?

Can you help me please ?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    Posted on Jul 17, 2009 at 03:18 PM

    Hi kraiem adel

    For your information for cancallation the status would be withdrawn. Kindly do the checking like this. Tagg the std workflow for cancallation. Check it once it will be surely the reqeust id would be same. No different request id for cancalletion. Check this. The tables are PTREQ_HEADER,PTREQ_ITEMS,PTREQ_ATTABSTAB.

    Regards

    vijay

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 17, 2009 at 04:14 PM

    This message was moderated.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Gurprit

      You are totally wrong. That link which you have given is absolutely wrong which is very old. The question is asked about cancellation not the design of the workflow. Not only that the link which you have given is totally wont suit for the ESS leave request. The link which you have shown is event based. But the question asked about the config based question.

      Regards

      vijay

  • author's profile photo Former Member
    Former Member
    Posted on Jul 20, 2009 at 08:36 AM

    Hi Expert,

    I will re-explain my question.

    In ECC6, int the template WS12300111, we have a step 'wait for status change '. This step wait untill the status change to cancel/ posted or with error.

    I presume if the user cancel the request before this one is posted and saved in the backend==> the request will be deleted.

    But If the user delete the request after this one is saved in the backend what will happend ?

    There is a new workflow launched ?

    it's the same workflow how will be launched ?

    Have I to create a new workflow to delete the record absence from the backend or i can use the same as fo create absence ?

    Thanks.

    Hope i m clear .

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      HI,

      when the associate delete a leave request, the cancellation workflow is triggered so it's ok. but the document id is different ?

      As i said i had two approval steps and i store the approval status in a table . but as the doc id is not the same, i can't check if the leave request is partially or totally approved ? any ideas ?

      I create method using the FM PT_ARQ_REQUEST_EXECUTE with the parameeters needed (request id, pern and modus and command) but i have an error "no ncustomizing for status ARQ,s tatus posted event delete " ==>

  • author's profile photo Former Member
    Former Member
    Posted on Jul 21, 2009 at 08:40 AM

    two level approval ==> reset the status to sent

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.