CHARM TMS configuration

Former Member
0 Kudos

Hello,

We are implementing CHARM in our project.. The landscape in our project is as below:

D-100 - Dev client

D-200 - Unit test client (Dev sys)

Q-100- Quality system (Integration Testing)

P-100- Production System

We have configured (client specific roots) TMS as D-100 --» Q-100 --» P-100. Is it possible to include D-200 as Unit test client in TMS?

As per SAP docs, once the Change Manager approves the reqeust, further tasks (creating transports and unit test...) will be handled by Developer. The developer will perform configuration in D-100 and accordingly create the transport request. Now IT operator will need to move the reqeust to testing client (D-200).

How the transport will be moved from D-100 to D-200 (Unit test client)??

Appreciate your reply.

Thanks,

SM

Accepted Solutions (1)

Accepted Solutions (1)

william_bowman
Participant
0 Kudos

If you want them moved prior to releasing to Q then the transports will have to move using SCC1 (Client copy of transports). If you do this, make sure your transport group also moves them back into the D200 client after being released. Then schedule an import all job to run there periodically. This will keep your unit test client in the same transport order as your Q system.

Answers (1)

Answers (1)

Former Member
0 Kudos

There are different ways to do this.

One option is:

1) Goto transaction STMS

2) Select 'Overview --> Imports'

3) Double click on the system you wish to schedule the job for

4) Click on the truck icon to schedule an import all job (only import

all jobs may be scheduled as periodic)

5) Fill in target client, if necessary

6) Select 'At start time' and fill in the date and time

7) Next to 'Period' there is a box with a gray background. If you

click in the box a drop-down arrow will appear. Click on this.

😎 Select your period from the menu options and click on the green

check.

9) Click on the green check again and your job will be scheduled.

or

Scheduling the Automatic Import of U_gent Corrections via /TMWFLOW/SCMA_BTCH_SYNC_UC

http://help.sap.com/saphelp_sm40/helpdata/en/96/0737423df2b26be10000000a155106/content.htm

or

give your IT Operator proper Roles to do the import manually

or

give your IT Developer proper Roles to do the import manually

Nesimi

Former Member
0 Kudos

Dear Nesimi.

We are facing the following problem. We need to follow the instruction at the help sam com form Scheduling the Automatic Import of U_gent Corrections .

http://help.sap.com/saphelp_smehp1/helpdata/en/96/0737423df2b26be10000000a155106/content.htm

But there is one info in Prerequisites:

The u_gent correction has been imported into the production system where the change request originated.

Why the u_gent corr must be imported in to the production system prior the schedulled job??? We do not understand this step.

Thank you for you reply.

Petr Syka

Former Member
0 Kudos

Petr,

I am reading that sentence back and forth in english and german and it does not make any sense for me to import something into system X manually - because I want to automat the X-import - and afterwards schedule something which is doing the import of X automatically...

please anyone correct me if I am misleading here.

regards

Nesimi