Hi Experts,
I have a background job running every sunday with programs RM60RR20 (T.CODE MD74), RM60RR30 (T.CODE MD75) & RM60RR30 (T.CODE MD76) as steps.
The variant for each program is defined with two entries i.e plant (range from 0000 to ZZZZ) and Version (00 to YZ)
Actually speaking these variants should cover all the materials in all the plants for the above job.
But we could find some materials still showing previous week's PIR and the client is annoyed.
Analysis so far:
1. I compared the material master (MARC entries) for correct and problematic materials. Both have similar entries.
2. When i enter the problematic material and run manually in MD74, MD75 & MD76, they are running fine and doing its job correctly.
I am confused why certiain materials are still having previous weeks PIR.
Can anyone shed some light on the possible cause? Thanks in advance.