After Refering these guides, i was able to start EHP1 upgrade in solman,

Note 1169247 - Enhancements to Solution Manager 7.0 EHP1 upgrade (SPS18,19)

Note 394616 - Release strategy for SAP Solution Manager

/people/tony.dethomasis2/blog/2009/03/09/applying-solution-manager-70-enhancement-pack-1

Note 1142832 - Installation Enhancement Package 1 for Netweaver 700.

Note 53902 - Conflicts between Support Packages and add-ons.

But i have a problem, upgrading SAPBASIS component, there is an conflict between add-ons, it request me to include the CRT for K-701DHINPIBASIS, OF ST 400, 18, After including also i get the same error.

this is the error i get

Conflict resolution by including the CRT SAPKITL428 for Add-On ST rel.400

Message no. TN433

Diagnosis

The conflict check detected conflicts between the Add-On ST release 400 and the OCS Package SAPK-701DHINSAPBASIS.

System Response

The system stops processing the queue.

Procedure

In order to resolve these conflicts, include the Conflict Resolution Transport (CRT) SAPKITL428 of the Add-On ST release 400 in the queue:

If it is an SAP Add-On, look for a CRT SAPKITL428 in the Software Distribution Center of the SAP Service Marketplace (http://service.sap.com/swdc).

If it is a third-party Add-On, contact the Add-On vendor and ask about the availability of the CRT SAPKITL428.

If the CRT is not available, you must remove the Support Package SAPK-701DHINSAPBASIS from the queue.

Regards

Melvin

Edited by: jude melvin on Jul 15, 2009 7:39 AM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 15, 2009 at 06:12 AM

    Hi

    Have you used MOPZ to calculate the queue?

    Regards

    Uday

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 15, 2009 at 11:16 AM

    Hello,

    did you look at the details in note 1169247 ( Performing the upgrade) where it say for SAINT to manually select the package SAPKITL428 ... from the dropdown list?

    Regards,

    Ingrid

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 15, 2009 at 11:18 AM

    Hello,

    did you look at the details in note 1169247 ( Performing the upgrade) where it say for SAINT to manually select the package SAPKITL428 ... from the dropdown list?

    Regards,

    Ingrid

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 15, 2010 at 07:11 AM

    The issue was resolved by calculating the queue all to gather,

    in solman EHP1 we need to include all the components togather and calculate the queue, then import, it worked.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.