How could i Calculate the cost of the material.

former_member196331
Active Contributor
0 Kudos

Actually i am working on costing.
Production order posted: for 100 qty., so, 100 Delivery qty,
For production above i need to issue Rawmaterial1 is 100 qty.
So for producing Finished mat1(100)qty = i need to issue 100 qty of raw material.
So, i was issued 100 qty of raw material. Using 261 Movement.
Now confirmations, I have 3 operations lets op10,op20,op30.

So, three times i would like to take Goods receipt and confirmation also.

Now for confirmation for 25 qty and Goods receipt also 25

Yeild HoursBooked For 1 qty

op10: 25 5 0.2

op20: 25 6 0.24
op30: 25 7 0.28


here cost is i need to calculate on the bases of two.
a)Raw material cost b)hours cost

So issued raw material 1 so, i went to mseg and the material cost is 99601.00 For 1 unit price is 996.01

Now calculate the hourse.

For 1 qty
0.2
0.24
0.28

So, 0.2+0.24+0.28 = 0.72 * Cost center machine price (375) =

= 0.72*375 = 270

= 270/ 25 = here 25 is gr qty. I need per unit
= so,

= 10.8 hours cost for machine.
= Now material cost for 1 unit is : 996.01

= material cost + hours cost

= 996.01 + 10.8 , = 1006.81

This value i am passing to the material while taking gr, So, 25 qty i am taking goods receipt, system will multiple with 25 * 1006.81

= 25170.25

= Goods receipt value is 25170.25

Second time i am taking confirmation for 40 qty like.

Yeild HoursBooked For 1 qty

op10: 40 5 0.125

op20: 40 6 0.15
op30: 40 7 0.175

for 40 qty i am again calculating the same process for above. I am not considering the first confirmation for 25 qty. only for 40 qty i am considering, because i am now posting for 40 qty.

next time remaining 40 , Order is closed.


But some time.
order qty : 100


First time confirmed for 25 qty using co11n
and Gr has taken only : 20, qty 5 yield confirmation i had taken extra.


Next time confirmed for 30 qty using co11n.
and gr has taken only: 25 qty using Co11n.

How could i calculate the hours , as per the above because hours and confirmations are not equal. in after first confirmation 5 yield confirmation is pending. I need to consider that one too. Writing logic in the coding is getting trouble. Is there solutions or table.

Need valuable suggestions.