BOM Explosion

Hi Friends,

I have a parent material which has two child components A and B.

I have two subcontractor vendor (X and Y),who provide the same parent material.

But the main thing is that,

Vendor 'X' consumes 20nos of component A and 20nos of component B to produce 10nos of parent material.

while Vendor 'y' consumes 22nos of component A and 22nos of component B to produce 10nos of parent material.

i have maintained the BOM for that parent material by using alternative BOM.(1 and 2)

My requirement is:

While making PO for that particular vendor,that particular BOM should explode there.

ie for vendor 'x' - BOM1 should explode and

for vendor 'y' - BOM2 should explode in the PO.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    avatar image
    Former Member
    Jul 09, 2009 at 08:55 AM

    Hi,

    You can solve this via production version.

    1. Assign the alternative BOM to a production version (C223)

    2. Assign the production version to the subcon info record (ME11 / ME12)

    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b2/fa1ed4d51d11d1a69e0000e83235d4/frameset.htm

    (Please search the forum before asking, this issue has been discussed several times)

    Regards,

    Csaba

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 09, 2009 at 09:07 AM

    Your issue can be resolved by means of production versions.

    Create a Production Version (TCODE:C223) for each alternate BOM , and then in the subcontracting Inforecord , you need to assign the desired Version . So while creating the Subcontracting order , system will pick up the BOM as per the version.

    ref thread:

    alternative-bom-for-subcon-po

    Raviraj

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 09, 2009 at 09:29 AM

    Hi,

    Even you can create Production Version in Material Master MRP4 Screen.Here you need to mention your Alternative BOm 1 and 2 for your 2 production Versions. And then in Inforecord , you need to mention your PVs .

    Then run MRP and findout.Your problem may get solved.

    Cheers,

    Kumar.S

    Add comment