cancel
Showing results for 
Search instead for 
Did you mean: 

Posting period issues.

Former Member
0 Kudos

Please advise me that if we close the posting period in advance date like upto March 2010 thru MMPV by mistake, how can we rectify the problem i.e coming back to July 2009 date.

Can we solve this issue with ABAP ! And also note that we put a tick on OMSY for Allow back posting field.

regards,

Arindam

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos

You need to initialise the period through MMPI.

For more details, Check these threads

[mmpi|]

[mmpv|]

thanks

G. Lakshmipathi

Answers (3)

Answers (3)

Lakshmipathi
Active Contributor
0 Kudos

You need to initialise the period through MMPI.

For more details, Check these threads

[mmpi|]

[mmpv|]

thanks

G. Lakshmipathi

former_member315051
Active Contributor
0 Kudos

Check the below SAP Note 487381 , co ordinate with your ABAPer to apply this note , may be usefull for this requirement.

skrishen9
Contributor
0 Kudos

Hi

please go through thelink which you will find useful.

Thanks

Sushant