Skip to Content
0
Former Member
Jul 09, 2009 at 05:47 AM

challan material is different from material document

48 Views

Dear All,

When i going to reconciliation of subcontracting challan on t-code J1IFQ

*material document -MIGO Number(which was created at the time of MIGO)*

*Year-2009*

when i feel the detail like

year challan no Item

2009 00000001

it also show a warning message *material document MIGO Number(which was created at the time of MIGO) 2009 is allocated a challan during GR**

im getting a error message

challan material is different from material document

Pls Guide me

Thanks

Amin

Edited by: sekh amin on Jul 9, 2009 8:16 AM