Skip to Content
0
Aug 30, 2018 at 03:53 PM

Quality Inspection lot in production QM / EWM

1238 Views Last edit Aug 30, 2018 at 03:55 PM 2 rev

Hello,

It's about an integration point of QM and EWM (Présampling in production). An inspection lot must be triggered by de release of the process order. Inspection starts before the goods receipt posting from production to the warehouse stock in SAP EWM (before the inbound delivery). For now, I have the inspection lot (17) but after the declaration of production.

I make some Custo : I activated the IOT 4 and i checked "présampling in production", Also I activated the application BTE for production.Still no result !