cancel
Showing results for 
Search instead for 
Did you mean: 

Material requirement grouping Project delivery

Former Member
0 Kudos

Hello,

We have a scenario wherin Delivery through projects needs to be done for material with MRP grouping. The material is grouped at top level WBS. Once the material comes in stock through procurement cycle at top level WBS the same is transferred to lower level WBS . The problem is that at the time of Delivery from project for MRP grouped material, 'Availability check' does not work and Qty appears blank at the time of delivery. Once MRP group is removed, the qty appears in delivery.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Goto OPPR t.code and slect your MRP group and plant , in that check the requirements grouping indicator is set or not. You have set that indicator.

Check the availabilty check for dep req tab

Maintain the Checking Rule

Thanks

S.Murali

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

please read FAQ note 677169 section 3:

....

b) Why is availability check not executed in CNS0 ?

Answer:

Please check whether availability check is switched off by

delivery item category (0VLK; indicator 'AvailCkOff').

c) Why does availability check in CNS0 return different quantitites

than availability check in network ?

Answer:

Availability check is controlled by checking rule and checking

group. In CNS0 checking rule is hard coded to 'B ' for plant

stock and 'BE' for individual stock. In network checking rule is

defined by order control (plant/order type/business func.) and

might therefore differ from the hard coded checking rule used by

CNS0.

Please be aware that also in SD ATP checking rule for delivery is

hard coded with same values.

Please check ATP result with transaction CO09.

.....

Kind regards

Peter

Former Member
0 Kudos

Hello,

The checking rule as well as Material requirement grouping has been maintained. Do you mean the 'dep req tab' in the checking rule?

Former Member
0 Kudos

Hi,

goto IMG>ps>material>procurement>activate MRP groups for requirement grouping/determine WBS acct asst at MRP area level.

make those two settings.

goto IMG>ps>material>availability check> define cheking rules/checking scope/checking control.

make the settings for plant and network types.

in OPPR for plant and mrp group check "project stock reqt grpg" along with Check Rule Dep Req.

Rgds

Sudhir Reddy