qm task list- work center

Hi, while creating the task list, thw ork center we mention, is it the production work center? let us say at prod work center X is used to manufacture at operation 10, we need only micrometer to check the dimensions of at that opeartion, do we need to mention micrometer as quality work center? pls brief.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Jul 09, 2009 at 04:07 AM

    Dear Yadav

    The need of putting work center in the task list is to capture the activity costs. If you need to capture the cost incurred in the inspection operation you have to maintain a workcenter ( which has an activity type and the cost center) if there is no such requirment do not maintain any work center

    Regards

    Gajesh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 08, 2009 at 04:53 AM

    Hi

    As you know the work center is maintained at the operation level of the task list.

    First understand the significance of work center.

    Generally Work center are related to routing where multiple operations are there & multiple stations of work are there.

    In the work center we maintain the Capcity of Man or M/C.Scheduling parameter & costing etc.

    These are generally centers where production work takes place.for a perticular station while confirmation of Production order we can calculate the Number of m/c hr & man hs for a perticular job.

    But in Quality we do not have such stations in the task list.

    We can miantiain this only for information purpose like QREC QFINAL QINPR etc.

    where as micrometer etc are the PRTs and can not be work centers

    I hope this is clear to you.

    Regards

    Sujit

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi, there will be no quality work center. inspector is just using micrometer. what is meant by quality work center here? pls mention.

  • avatar image
    Former Member
    Jul 08, 2009 at 09:22 AM

    No need to create micro meter as work center.

    Create micro meter as PRT material, maintain 009 in task list usage of PRT view.

    In task list select operation and click on PRT at header text.

    Here click on Material and enetr Micrometer number that u have created. select control key as PRT and save.

    U can view this in Inspection plan print out also in t_code QP05.

    PLZ. REVERT FOR ANY CLARIFICATION.