Goods receipt for subcontracting material

493 Views

Hello friends,

i am doing operation subcontractiing. My first operation is subcontracted. So, I have assigned PP02 control key to first operation (external processing and no auto goods receipt indicator) and maintained external processing data for opration in routing. When i saved the order, for that operation PR gets generated.

Now, I converted PR into PO and assigned raw material that has to be send to vendor. By 541 mvt. type material is issued to vendor. When i do goods receipt in MIGO, system is not showing storage location field. I dont find material in stock anywhere.

But i can see quantity received in external processing tab of first operation in routing overveiw in order.

Then how can i issue the material from storage for second operation if it is not in stock?

How can i get stock of subcontracted material by MIGO?

Please help me.

Thanks in advance!