Former Member
Jul 07, 2009 at 08:35 AM

Budget issue in interface between PS & PP

82 Views

We have got the error message no BP604: u201CWBS element XXXX budget exceeded u201C

We are using ECC 5.0 having package level up to 10,

For sales order material, processes through the project system and production planning.

E.g. Material STB having 2 sub assemblies SA1 & SA 2.

In project we using two hierarchy levels of WBS, lower level SA1 & SA2, for header WBS is STB, having budget 2, 00,000 for header & 5, 00,000 each for SA1 & SA2 WBS. Means Total UP showing 12, 00,000 of budget in project.

SA1 BOM is assigned to SA1 WBS & SA2 BOM is assigned to SA2 WBS.

All actual cost for SA1 & SA2 child parts are posted to SA1 & SA2 WBS also

Production order made for SA1 & SA2 , After confirmation of these production orderu2019 s SA1 XFG part is available in SA1 and SA2 XFG part is available in SA2 WBS element.

The valuation of SA1 and SA2 is equal to the expenditure in the SA1 and SA2 WBS element respectively u2013 Rs. 5, 00,000 each.

Now for the production order STB part , SA1 and SA2 are required in the STB WBS element stock at level 1. But when we try to move XFG part from lower level to upper level STB WBS element , the system gives above mention budget error .

If require suggest new process also for above scenario ...sudhir sir I expect answer from you.

regards

sandip