Skip to Content
0
Former Member
Jul 06, 2009 at 08:07 PM

Is it possible for an item to be both phantom and finished good?

450 Views

We have a situation where the client needs a phantom item with bill of material. It is a subassembly and the way SAP explodes it on the higher level bom is perfect. However this same item is also sold when not used as a subassembly. The only answer I can find is to have two part numbers, but this does not help the client becase it is the same item whether it is used as a subassembly or is sold as a unit. Is there a way for it to be both? Or another way to manage this issue?

Thanks