Hi All

I have to use milestone billing in some of my projects. So, following the same i have done some IMG settings like:

Defined billing plan type for milestone billing

Defined date description

Defined & assigned date category

Assigned billing plan to Sales doc type

Assigned billing plan type to item category

Now, Firstly i would like to cofirm whether i have done all the configuration steps required for milestone billing or is there any necessary step missing?

Secondly, after configuration what are the required steps need to be done at user level? As i am doing it for the first time i am not very much aware about the steps and settings need to be done at cofiguration and user level .

waiting for your valuable inputs