Hi All
I am creating an evaluation plan (Evaluation Setup > Planner) in NWBC for GRC PC 2.5 for the Plan activity 'Perform control design assessment' and maintained the control design survey and in the Step 4 i.e.confirm and activate, system is giving a message as "0 Object selected for current plan activity" and below in the selection data controls selected is shown as "0".
I have checked the above with different options by selecting all the selection procedures in Step 3 i.e.Perform selection
Thanks & Regards
Ram