on 11-15-2016 5:31 PM
Hi Experts,
I have enhanced a routing and assigned Return to Original and Previous for next step determination to an operation. I understand this step works with production routing operations.
When I complete the operation in the production routing, I do get the pop-up showing the next step / operation but for the Return to Original and Previous line, the previous operations are not getting listed. Also when I select this line and complete the SFC attains done status.
What can be the reason for this? This step is supposed to give me the list of previous operation.
Am I missing some thing here?
Would be thankful for any reply on this.
Thanks in advance
Srinivas
I'm having the same problem.
Return to original step and return to next step both results in a DONE Sfc. Which makes no sense.
SAP ME 15.0
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
13 | |
6 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.