Hi,
I am working on SOP and i have a scenario. I have two product Groups , A and B. Product group A contains materials - X, Y and Z.
Product group B contains materials M,N and Z. I have made the sales and production plan, disaggregated according to the proportional factor.
Also i have made the PG A as Active and transferred to Demand management in MC75. The requirement for materials are transferred.
Now i transferred PG B. Requirements for material M and N are transferred and requirements for Material Z is overwriting the
previous requirement. I want that to be cumulated.
Please guide me how this could be done..
Regards
Srinivasan