Former Member
Jul 02, 2009 at 04:29 PM

work center capacity

52 Views

Hi, we have annealing machine which is designed for 10,000 kg output, accordingly machine cost is distributed for recovering for 5 yrs. now either we keep 1kg or 100 kg for each time inside the machine, it takes 2 hrs to heat and cool the inside kept products. now we want to calculate the utilized capacity of the machine interms of kgs. how to set the same in sap?