Hi,
I am having a issue with PPDS heuristic MRP with shelf life. I have 2 products (X and Y) at the same location setup exactly the same way on the same resource.
Both of them have the exact same master data but the system is planning Xl but not planning Y. I ran MRP with standard lot sizes instead of MRP with shelf life for Y and it created orders.
I am wondering what is making the system not create orders when using MRP with shelf life.
I checked the master data for shelf life. The min and max shelf life are populated and the indicator " planning with shelf life" is checked.
I appreciate any suggestions.
Thanks.