Error when save project Access via 'NULL' object reference not possible

Former Member
0 Kudos

Dear All,

When i create project & try to save ,system gives me error 'Access via 'NULL' object reference not possible'

Steps

1.Create project & element

2.save

showing below error

Note

The following error text was processed in the system PLD : Access via 'NULL' object reference not possible.

The error occurred on the application server Ndimdev_PLD_20 and in the work process 0 .

The termination type was: RABAX_STATE

The ABAP call stack was:

Error code: ICF-IE-http -c: 300 -u: PLMUSER1 -l: E -s: PLD -i: Ndimdev_PLD_20 -w: 0 -d: 20090702 -t: 164926 -v: RABAX_STATE -e: OBJECTS_OBJREF_NOT_ASSIGNED

Please do needful

Regards

Ravindra

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member201206
Active Contributor
0 Kudos

Hi Ravindra,

Such error is typically caused by a r Badi or custome mdofication, as the steps carried out is really straightforward. I donot think, it is an error in standard. If you have Debugging experience, you can set break-point the involved codes. Using the ST22 you find the related codes.

Kind regards,

Zhenbo

Former Member
0 Kudos

>

> Hi Ravindra,

>

> Such error is typically caused by a r Badi or custome mdofication, as the steps carried out is really straightforward. I donot think, it is an error in standard. If you have Debugging experience, you can set break-point the involved codes. Using the ST22 you find the related codes.

>

> Kind regards,

> Zhenbo

Hi Zhenbo,

Also when i am going to delete Project already created in cproject showing me below error

An error occurred when connecting to the accounting system

Message no. DPR_FIN_GECCO001

Diagnosis

A connection to the Accounting system could not be made. Possible causes are:

The system is not available

The RFC destination for the Accounting system is incorrectly defined in Customizing.

System Response

The system could not read data from the Accounting system. The system cannot distribute project data to the Accounting system.

Procedure

In transaction SM59 check the RFC destination defined for the Accounting system.

Check whether you defined the correct RFC destination for the object type. See Customizing for Collaboration Projects under --> --> .

Regards

Ravindra

Former Member
0 Kudos

It seems the problem relies on your accounting integration. Have you customized this functionality? Is it working (before saving the project)?