Dear All,
I have the following scenario.
In Routing,
1. Work center should always be with 6 digits
2. Final operation control key should be with PP01
3. If work center is XXXX, my cost element should be 5061007. if it is different work center, my cost element value may vary.
(The link between work center and cost element, i will keep in one Z table)
4. Labor time will always be equal to machine time
These check should be done before saving the routing. Can I achieve these through any enhancement or exit or any.
Please guide me.