We have been running SAP for 11 years and ran annual disaster recovery exercises with success.
Have recently moved our SAP solution to new OS/DB platform Windows 2003 w/ MS SQL Server. The responsibility of performing the DR exercise has shifted from the Basis team to our Infrastructure team.
Going thru some large growing pains shifting the disaster recovery exercise and execution. We cannot be unique here so was wondering if anyone has a skeletal script that they'd be willing to share showing the steps taken to restore / lay down their SAP solution (preferably a dual stack ABAP/java -- eg one of the following ECC/PI/BI) during a disaster recovery exercise (cold site)
Hope this makes sense -- latest in-house testing of process (pre DR exercise to be performed at cold site) is showing that there's some fundamental things missing (eg environment variables, <sid>adm user for DB)
Thank you in advance
Doreen