Lot size HB

711 Views

Hi

I am having raw material with following setting in MRP VIEW.

MRP- V1

lOT SIZE- HB

MAXIMUM STOCK LEVEL-- 1000

REORDER POINT -- 500

Stock of above material is Zero. When Mrp is done then it created PR of 1000 Quantity And it is ok as per setting.

Iam firming this PR. When I change maximum stoxk level to 1500 then system creats planning file entry ( Net change planning indicator and Net change planning indicator in the planning horizon). When iam doing MD01 then it should create another PR . But it is not happening. After MRP planneing file entry Goes away.

If First pr is not firmed then it changes PR to 1500 quantity.

Please explain why it is not creating second PR if first PR is firmed.??