We are doing data loads. The ABAPER has loaded 2013 and I am running time eval to update that in production.

when he uploads that thru 2013 and when i run time it updates quotas , thast ok....but i am just doing test run to see how the quota is generated afterwards. Its generating quota but with different line. I mean lets say he uploaded 5 hrs of vac quota (25) , when i run time eval next day quota should be 5.22 as .22 is given each day. but it is like this

first line' 25: 5

second line 25: 0.22

I thought may be it is config issue but then i deleted all his stuff and uploaded the quota correction 2013 myself manually and then ran time eval for next day its correct...it shows 25 : 5.22

what can be the prob ?

Could you please suggest something.