Skip to Content
0
Former Member
Jun 30, 2009 at 10:50 AM

Cannot change Material Type due to existing DR

37 Views

Hi All,

I tried changing one material by it reflects an existing Delivery for the said material, I checked the DR and found that it was already received - although its Shipment Cost hasn't been transferred. What should be done with these DRs?

=)