Hi All,
May I ask what are the other prerequisites in changing the Material type?
What I know is stocks must be zeroed out, Open POs must be closed (is it the open POs only? or all POs with the specified material?) ,and OLD and NEW Material type should have the same Value and Quantity Updating setup.
I tried changing one material by it reflects an existing Delivery for the said material, I checked the DR and found that it was already received - although its Shipment Cost hasn't been transferred. What should be done with these DRs?
Thanks a lot.
=)