DMR reset based On Cummulative Quantity.

former_member553099
Participant
0 Kudos

Dear all

Currently : DMR works based on No of Lots/ No of days. so if once no of lot / no of days is reached whichever is earlier system will bring the inspection lot for inspection.

Requirement : DMR needs to be work based on No of cumulative quantity/

No of days.

For example: DMR will be maintained at Plant/material/vendor combination.

cumulative quantity will be defined for above combination, for ex if qty is maintained as 6000 qty as parameter.

Quality level needs to be reseted based on cummulative Qty.

GR 1 : lot qty =1500 (First lot needs to be inspected) stock will comes in Quality

GR :2 : lot qty=2000 (Skip Lot-no need for inspection) stock will not comes in Quality

GR :3:lot qty=2500 (Skip Lot-no need for inspection) stock will not comes in Quality

So based on parameter Cumulative qty reached to 6000 qty.

GR :4: This 4th GR inspection Lot needs to be inspected , quality level needs to get reset and bring the inspection lot to inspection at the time of GR itself It is the requirement and also the bring stock will come in quality stock.

Kindly suggest the suitable solution to meet above requirement.

Regards,

Linganathan

former_member553099
Participant
0 Kudos


Dear all,

Need Urgent help

Regards,

Linganathan