Hi,
I have a weird issue.
I have 3 materials. one material (fert_mat1) without PPM and other is also FERT (fert_mat2) but has a dependent reqt HALB (halb_mat1).
case 1. fert_mat1 - no ppm
case 2. fert_mat2 -ppm
- halb_mat1
I entered forecast for both materials. when I run a product heuristic for both materials, characteristic requirements are getting transferred to planned order only in case 1 but not in case 2.
for case 1, when I try to convert that planned order to purchase req, the characteristics are getting transferred. In case two, it is completely ignoring characteristics. Is there any badi/fm that I need to apply or is there any oss note for this ? or is there any other reason for this.
thanks