cancel
Showing results for 
Search instead for 
Did you mean: 

file Scheduling

Former Member
0 Kudos

Hi experts,

just a quick question.

when u schedule a file in file adapter using availibilty time planning does the adapter remains as stopped for rest of the time?

or do I have to start it after changing the scheduling time as its showng me as channel stopped.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

normally availibilty time planning starts the channel at the specific begin time you give and stopps it at the end time.

Regards,

Kai

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

when u schedule a file in file adapter using availibilty time planning does the adapter remains as stopped for rest of the time? - Yes

do I have to start it after changing the scheduling time as its showng me as channel stopped - During the scheduling time, the comm channel will be working and during the remaining time it will be stopped...........it will automatically start at scheduled time...while scheduling the file adpater in availability time planning, click the button for Automatic Control...........

Regards,

Rajeev Gupta

Former Member
0 Kudos

Hi Nidhi,

ATP is available since PI 7.0. For the period specified in ATP w.r.t adapter , the communical channel is active and for other period in that scheduling cycle, its off. You can refer to belowlink for more details.

[/people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-|/people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-]

- Sarang

Former Member
0 Kudos

CC will be in stop mode for the time other then specified in availability planning,

Edited by: NetWeaver Expert on Jun 29, 2009 2:42 PM